Advice – LABEC M-TIT-5 User Manual
Page 3
ADVICE:
Read this instruction in detail before operating the meter.
The meter should be re-tested by metrological department when it is used over one year. And
the meter can't be used until it is up to standard.
The warranty of quality for all electrode is one year. The electrode should be changed in time
after warranty no matter whether it is used, since the performance of it will be influenced.
2
See also other documents in the category LABEC Equipment:
- AA13 (7 pages)
- GW1060 (44 pages)
- SS1 (4 pages)
- AA-8BS (30 pages)
- AA-22BS (32 pages)
- AA-22N (32 pages)
- AA-8S (33 pages)
- AA-22S (26 pages)
- Shinva-45B (21 pages)
- AA9 (6 pages)
- USC-5L (5 pages)
- WS1.0 (3 pages)
- BEM4 (4 pages)
- LHF-40 (5 pages)
- NBCT2 (4 pages)
- NBCT7S (4 pages)
- ICB-12 (3 pages)
- LBC-4 (4 pages)
- SB-SDC-6 (5 pages)
- J-NBT (16 pages)
- BOB1 (5 pages)
- M-SOD-3636 (3 pages)
- J-SWB35 (21 pages)
- FXP16M (13 pages)
- M-SI-100 (3 pages)
- M-TMO1600 (3 pages)
- M-HOG-020 (13 pages)
- M-HOG010 (12 pages)
- J-USRC (16 pages)
- Z-L-450 (17 pages)
- Z-L-450A (6 pages)
- Z-L-530 (20 pages)
- M-SCEN-206 (13 pages)
- M-SCEN-207 (12 pages)
- Z-ZHWY-2102 (9 pages)
- GLF-90 (2 pages)
- PLCF300 (2 pages)
- H-DW-HW50 (12 pages)
- DW-FL90 (8 pages)
- B-IM0070FSC (5 pages)
- GLR-70 (3 pages)
- PLRGD-1400PT (3 pages)
- PVR-130 (3 pages)
- SPR-100 (3 pages)
- CEMLS (2 pages)