beautypg.com

Pennant – LAARS Pennant PNCV (Sizes 500-2000) - Install and Operating Manual User Manual

Page 17

background image

Pennant

(500-2000)

Page 17

Figure 6. Hydronic Piping — One Boiler, Multi-Temperature System.

PRIMARY/SECONDARY MANDITORY FOR ALL

VARIABLE FLOW SYSTEMS

INSTALL AIR VENTS AT HIGH POINTS IN SYSTEM

PIPING & SIZING OF EXPANSION TANK

PER TANK MANUFACTURER'S INSTRUCTIONS

DIMENSION "C" (COMMON PIPING) TO BE FOUR

PIPE DIAMETERS, MAX. (NO ELBOWS OR VALVES)

BOILER CIRCUIT PIPING MUST BE EQUAL

TO BOILER WATER CONNECTION SIZE

BOILER CIRC. PUMP SIZED FOR FLOW THROUGH BOILER

DOTTED DEVICES INDICATE ALTERNATE LOCATIONS

PUT BOILER CONTROL SENSOR IN THE SYSTEM

PUMP LOCATION FOR PUMP-MOUNTED UNITS

SYSTEM PUMP

MAKE-UP

COLD WATER

PUMP LOCATION FOR
NON-PUMP-MOUNTED UNITS

SUPPLY WHEN USING THIS PIPING STYLE.

MINIMUM BOILER INLET WATER TEMPERATURE
MUST BE AT LEAST 120°F.

C

C

C

C

180°F

180°F

150°F

130°F

NOTES:
1. BOILER LOOP IN EXAMPLE IS MAINTAINED AT 180°F.
2. ZONE THERMOSTATS CAN BE INTERLOCKED WITH BOILER,

SO THAT BOILER FIRES UPON CALL FOR HEAT FROM ANY
ZONE.

3. ZONE PIPING AND INTERLOCK WIRING TO BE DESIGNED

BY SYSTEM ENGINEER.

LEGEND

CHECK VALVE

THERMOMETER

TEMPERATURE
SENSOR

GLOBE VALVE

EXPANSION TANK
WITH AIR SCOOP AND

AUTO AIR VENT

3-WAY VALVE

VALVE

CAUTION: THIS DRAWING SHOWS SUGGESTED
PIPING CONFIGURATION AND VALVING, CHECK
WITH LOCAL CODES AND ORDINANCES FOR
ADDITIONAL REQUIREMENTS.

PRESSURE REDUCING VALVE
W/ FAST FILL BYPASS

PURGE

VALVE

PUMP

This manual is related to the following products: