2 unpacking and placing – KERN & SOHN DLT 100-3N User Manual
Page 14
![background image](/manuals/697262/14/background.png)
14
DLT_N-BA-e-1421
6.2 Unpacking and placing
1. Drying unit
Take the instrument carefully out of its packaging, remove the plastic jacket and
install it at the designated work space.
The instrument is supplied part-assembled. Immediately after unpacking check if the
delivered items are complete. Assemble the separate component parts according to
their sequence.
1. Windshield
2. Sample dish holder
3. Removal aid
4. Sample dish
1. Put windscreen in sample chamber.
2. Carefully put sample dish holder on top.
3. Position removal aid in a way that the handle fits under the groove of the
cover.
4. Put sample dish on the dish holder.
See also other documents in the category KERN & SOHN Scales:
- TEE 150-1 (2 pages)
- TCB 200-1 (2 pages)
- CM 60-2N (14 pages)
- TAB 20-3 (14 pages)
- TEB 200-1 (11 pages)
- EMB 100-3 (18 pages)
- EMB 500-1GN (16 pages)
- EMB 500-1BE (48 pages)
- DBS 60-3 (91 pages)
- DLB 160-3A (59 pages)
- MLB 50-3C (68 pages)
- MLS 50-3C (83 pages)
- ABS 80-4N (96 pages)
- ABT 120-4M (72 pages)
- AES 100-4C (119 pages)
- AES 100-4N (85 pages)
- AET 500-4 (189 pages)
- ALS 160-4A (78 pages)
- ALT 160-4B (94 pages)
- ECB 10K5 (16 pages)
- ECE 10K5 (12 pages)
- FCB 3K0.1 (36 pages)
- FCE 3K1N (15 pages)
- FFN 1K-4N (32 pages)
- FKB 6K0.02 (42 pages)
- FKB 8K0.1A (39 pages)
- FKT 6K0.1 (53 pages)
- FKT 60K1L (7 pages)
- FOB 1.5K0.5 (21 pages)
- GAB 6K0.05N (41 pages)
- GAB 6K-5P (39 pages)
- WTB 1K-4N (35 pages)
- FOB 500-1S (17 pages)
- FOB 0.5K-4NS (27 pages)
- IXS 6K-3M (109 pages)
- IXS 6K-3M Platform (9 pages)
- SFB 50K-3XL (53 pages)
- SFB 50K-3XL Addendum (6 pages)
- KFE-TM (58 pages)
- FXN 3K-3 (22 pages)
- IEX 6K-3MEU (13 pages)
- IEX 6K-3MEU Safety (11 pages)
- OEX (15 pages)
- OEX Safety (12 pages)