Golden Lighting 7116-BA2 LC User Manual
Parts & assembly sheet, Parts list
Part Needed
Quantity
Part Needed
Quantity
Reason why
( missing, scratched, broken glass, bent, bad finish)
Comments
PARTS & ASSEMBLY SHEET
Fixture Name: Mayfair 7116-BA2 LC
This fixture assembled PO:__________ Date: ________
3ea P3 Orange
2ea 5/32-IP*1-3/4"
Notice:
Please review the parts listing and check for all parts before assembling the fixture. If any parts
are missing or damaged, please note onthis sheet and contact the place of purchase to arrange for
replacement parts.
PARTS LIST
Company Name:_______________________Co. Account #:_____________
to be filled out by retailer
2ea 5/32-IP*H3mm
Circular
Mounting Strap
Mounting Screws
Deco Nut
For Customer Service, contact the place of purchase to arrange for replacement parts.
F
IXTURE
A
SSEMBLY
I
NSTRUCTIONS
Read and review installation instruction sheet, but
do not install before assembling the fixture.
7116-BA2 LC
1. Slide the Glass Shade (J) over Socket ( I) and
secure Glass Shade (J) by threading the Socket
Ring (O) to Socket (I) until tight.
2. Thread the final cap (R) into the square tube (S)
unitl tight.
3. Install the light bulb in accordance with the
fixture's specifications.
(DO NOT EXCEED MAXIMUM WATTAGE RATING
Fig 1
NOTE: I
NSTALL THE GLASS ASSEMBLY AFTER
THE FIXTURE IS HUNG.
Wire connectors
Mounting Screws
Hex Nut
1ea ∅4"*H2mm
2ea 8#32-IP*1"
2ea 5/32-IP*H9mm
7116-PartsInstallation_20110106m.xls