6. Feed the fixture wires through the Chain (every three links)
and pull the wires until taut.

7. Slip Canopy loop collar (H) over the chain, then do the
same with the canopy (G).

8. When ready to complete the installation Use the other
chain connector and attach the other end of the chain to the
canopy loop (F) and close the chain connector.

9. Make sure the weight of the chandelier will be supported
by the chain-not the electrical wire.

ASSEMBLING THE FIXTURE as Chain hung (Fig.2)

1. Unscrew the Hex Nut (V), then take off the small lock

washer (W), flat washer (X) and canopy (Y).

2. Feed the fixture wires through the Top loop (J) and pull the

wires until taut.

3. Then screw the Top Loop (J) to the threaded center of

fixture body (M) until tight.

4. By measuring determine correct number of links needed

for proper hanging height. Use a pair of pliers to open one

link of the Chain (K) then remove the excess Chain (K) and

discard it.

5. Use one chain connector (L) to attach one end of the chain

to the Top loop (J) and close the chain connector.

Fig 2

Note: Complete these remaining steps after the fixture is
hung.

11. Thread the Stem With Hex Nut (N) into the bottom
coupling of the fixtur body (M) until tight.
12.Slide the Flat Washer (O), Rubber Washer (P), Glass
shade (Q), Rubber Washer (P) and frame (R) over the Stem
With Hex Nut (N), secure in place with the Hex nut (S). Slide
the Bottom cap (T) over the Stem With Hex Nut (N), secure
in place with the Finial (U).
13. Install the light bulbs in accordance with the fixture's
specifications.

(DO NOT EXCEED MAXIMUM WATTAGE RATING)

PARTS & ASSEMBLY SHEET

Fixture Name: Pemberly Court 1821-SFBI

C

D

U

T

S

R

Q

P

O

N

M

P

V

J

X