beautypg.com

Installation instructions (cont’d), Venting (cont’d), Connecting pvc pipe vent to blower – Kenmore 153.335963 User Manual

Page 20: Venting through a roof all models

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

background image

Installation Instructions (cont’d)

Venting (cont’d)

CONNECTING PVC PIPE VENT TO BLOWER

1

.

The

manufacturer

has

supplied

a

3"

PVC

Schedule

40

street

elbow for connection to the water heater when turning imme­

diately

horizontally

off

the

blower.

Place

the

elbow

in

the

required

direction

on

the

blower

and

using

3

sheet

metal

screws, attach the elbow.

2, If there is to be a vertical run of vent from the blower, the 3"

PVC pipe must be attach^ to the blower using 3 sheet metal

3.

If the optional 2" vent piping is to be used (40,000 BTU/HR

models only), the 2" street elbow, 3" to 2" reducer and 3”

(minimum) section of 3” PVC or ABS pipe must be supplied

locally. The

3”

(minimum)

section of

3’

PVC or

ABS pipe

must be attached to the blower using 3 sheet metal screws.

Additionally, you must seal all joints using a suitable silicone

sealer such as GE RTV-103 or equivalent.

VENTING THROUGH A ROOF
ALL MODELS

1. The water heater requires its own (separate) venting system.

2. It cannot be connected to existing vent piping or chimney.

3. It must terminate vertically to the outdoors.

4. Total vertical and horizontal vent runs cannot exceed 35 feet.

5. Typical installation(s) shown below.

6. Refer to “Cementing PVC, ABS or CPVC Pipe and Fittings”

on page 19 and “Connecting Vent to Blower” on page 20.

VENT CAP MUST BE

POSITIONED

COWNWARD

MAINTAIN

listed

CLEARANCE

EXHAUST VERTICAL

ы

VENT

TOTAL VERTICAL AND

HORIZONTAL RUNS

CANNOT EXCEED 20

РЕЕТ WITH A MAXIMUM

Of THREE 90' ELBOWS

(10' MAXIMUM IF 2"

VENT PIPING IS USED

ON 40,000 BTUIHR.

MODELSI

20

This manual is related to the following products: