beautypg.com

Venting through roof - clearances, Installation instructions (cont'd) – Kenmore 153.335963 User Manual

Page 11

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

background image

Venting Through Roof - Clearances

#

0" clearance for 3" (or optional

2

") PVC, ABS, or CPVC Schedule

40 piping from combustible surfaces.

The Power Vent outlet terminal shall terminate at least 18" above

the roof surface. Figure 5.

#

The location selection must provide clearances for servicing and

proper operation of the water heater. Figure 4,

The venting system must be installed in a manner which allows

inspection of the installation of the venting pipes and joints as

well as periodic inspection after installation as required by ANSI

Standards.

Installation Instructions (cont'd)

11

This manual is related to the following products: