Installation instructions (cont’d), Venting (contad), Adanger – Kenmore 153.335963 User Manual
Page 19: A precautions
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".
Installation Instructions (cont’d)
Venting (contad)
CEMENTING PVC, ABS OR CPVC PIPE AND FITTINGS
Read
and
observe
ail
safety
information
printed
on
primer,
cleaner, and cement containers.
ADANGER
Primer, cleaner, and cements are extremely flammable.
They are harmful or fatal if swallowed. The vapors are
harmful. They may irritate eyes and skin and can be
absorbed through the skin.
A PRECAUTIONS
Always store primers, cleaner, and cements in cool, dry,
well ventilated places. Do not store them near heat,
sparks, or flames. Keep containers closed. Use them in
well ventilated areas. Wear impervious clothing while
handling. Do not smoke, eat, or drink while handling.
Wash thoroughly after handling and before eating. Wear
eye protection when handling. If swallowed, drink water,
do not induce vomiting, and call a physician or poison
control center immediatejjt If inhaled, get fresh air and
seek medical attention if ill feelings persist. In case of eye
and skin contact, immediately flush with plenty of water
for 15 minutes and seek medical attention if irritation
persists. KEEP OUT OR REACH OF CHILDREN.
All primers, cleaners, and cements muse meet all local codes and
applicable
standards
of
the
American
Society
For
Testing
Materials Standards.
Before
using
primers,
cleaners,
and
cements,
stir
or
shake,
mak
ing sure contents are liquid. Do not use if found to be lumpy or
jelly-like.
1. Cut pipe ends squarely removing all burrs and dirt.
2. Dry fit pipe and fittings to be connected for proper fit.
3. Clean pipe and fitting with a primer/cleaner.
4.
Apply
a
thin
coat
of
cement
to
fitting,
avoiding
puddling
inside.
5. Apply a liberal coat of cement to pipe leaving no voids.
6.
QUICKLY assemble parts while cement is fluid! If you wait
too long, re-coat pipes.
7.
Push pipe completely into socket of fitting, turning as it goes
until it bottoms.
8.
Hold pipe and fitting together for 30 seconds. Then carefully
clean
off
excess
with
a
cloth.
Allow
connections
a
sufficient
time to cure before disturbing.
9.
Remember
that
vent
pipes
must
be
adequately
and
securely
supported.
APPROXIMATE
SETTING
TIME
FOR
2V"
TO
4"
PIPE
JOINTS
MOVEMENT
COMPLETE
OF lOINT
SET
90°F to 150”F
X hr.
8 hrs.
50“F to 90°F
1 hr.
15 hrs.
0“F to 50°F
IX hr.
18 hrs.
CUTTING
OPENING
THROUGH
AN
OUTSIDE
WALL AND COLLAR INSTALLATION
After
reading
the
manual
and
you
have
determined
the
location
of the opening in the wall, (using the drawing below), cut a
3'A"
hole through an exterior wall.
NOTE: When determining location of the opening in the
outside wall allow for the %" rise pet foot that has taken
place in the horizontal run.
The 3” (or optional 2") PVC, ABS or CPVC Schedule 40 vent
pipe can be run from the water heater through the wall or from
the wall to the water heater, whichever is most convenient. The
vent
pipe
must
extend a minimum of
VA"
through
the exterior
wall. Extending the vent cap as far as possible from the surface
of the exterior wall will help minimize discoloration of the wall
in this area which may be caused by the flue gases. Note that the
inside collar must be slipped over the vent piping before locat
ing
the
pipe
through
the
wall.
Before
securing
the
inside
and
outside collars to the wall, use a silicone sealer between pipe and
opening to insure a water and air tight seal.
INSTALLATION SHOWING USE OF PVC, ABS OR
CPVC PIPE
19