beautypg.com

Installation instructions (cont’d), Venting (contad), Adanger – Kenmore 153.335963 User Manual

Page 19: A precautions

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

background image

Installation Instructions (cont’d)

Venting (contad)

CEMENTING PVC, ABS OR CPVC PIPE AND FITTINGS

Read

and

observe

ail

safety

information

printed

on

primer,

cleaner, and cement containers.

ADANGER

Primer, cleaner, and cements are extremely flammable.

They are harmful or fatal if swallowed. The vapors are
harmful. They may irritate eyes and skin and can be

absorbed through the skin.

A PRECAUTIONS

Always store primers, cleaner, and cements in cool, dry,

well ventilated places. Do not store them near heat,

sparks, or flames. Keep containers closed. Use them in
well ventilated areas. Wear impervious clothing while
handling. Do not smoke, eat, or drink while handling.
Wash thoroughly after handling and before eating. Wear
eye protection when handling. If swallowed, drink water,
do not induce vomiting, and call a physician or poison
control center immediatejjt If inhaled, get fresh air and
seek medical attention if ill feelings persist. In case of eye
and skin contact, immediately flush with plenty of water
for 15 minutes and seek medical attention if irritation

persists. KEEP OUT OR REACH OF CHILDREN.

All primers, cleaners, and cements muse meet all local codes and

applicable

standards

of

the

American

Society

For

Testing

Materials Standards.

Before

using

primers,

cleaners,

and

cements,

stir

or

shake,

mak­

ing sure contents are liquid. Do not use if found to be lumpy or

jelly-like.

1. Cut pipe ends squarely removing all burrs and dirt.

2. Dry fit pipe and fittings to be connected for proper fit.

3. Clean pipe and fitting with a primer/cleaner.

4.

Apply

a

thin

coat

of

cement

to

fitting,

avoiding

puddling

inside.

5. Apply a liberal coat of cement to pipe leaving no voids.

6.

QUICKLY assemble parts while cement is fluid! If you wait

too long, re-coat pipes.

7.

Push pipe completely into socket of fitting, turning as it goes

until it bottoms.

8.

Hold pipe and fitting together for 30 seconds. Then carefully

clean

off

excess

with

a

cloth.

Allow

connections

a

sufficient

time to cure before disturbing.

9.

Remember

that

vent

pipes

must

be

adequately

and

securely

supported.

APPROXIMATE

SETTING

TIME

FOR

2V"

TO

4"

PIPE

JOINTS

MOVEMENT

COMPLETE

OF lOINT

SET

90°F to 150”F

X hr.

8 hrs.

50“F to 90°F

1 hr.

15 hrs.

0“F to 50°F

IX hr.

18 hrs.

CUTTING

OPENING

THROUGH

AN

OUTSIDE

WALL AND COLLAR INSTALLATION

After

reading

the

manual

and

you

have

determined

the

location

of the opening in the wall, (using the drawing below), cut a

3'A"

hole through an exterior wall.

NOTE: When determining location of the opening in the
outside wall allow for the %" rise pet foot that has taken
place in the horizontal run.

The 3” (or optional 2") PVC, ABS or CPVC Schedule 40 vent

pipe can be run from the water heater through the wall or from

the wall to the water heater, whichever is most convenient. The

vent

pipe

must

extend a minimum of

VA"

through

the exterior

wall. Extending the vent cap as far as possible from the surface

of the exterior wall will help minimize discoloration of the wall

in this area which may be caused by the flue gases. Note that the

inside collar must be slipped over the vent piping before locat­

ing

the

pipe

through

the

wall.

Before

securing

the

inside

and

outside collars to the wall, use a silicone sealer between pipe and

opening to insure a water and air tight seal.

INSTALLATION SHOWING USE OF PVC, ABS OR

CPVC PIPE

19

This manual is related to the following products: