Cleveland Range Steam Cooker and Rethermalization Unit 22CET3A User Manual
Page 35
31
3-Phase Units
WATTS
VOLTS
PHASE
WIRES
CYCLE
AMPS
SUPPLY CONNECTION
HEATER RATED
HERTZ
WIRE SIZE (COPPER)
VOLTAGE
6400
208
3
3
60
17.8
12
208
5440
220
3
3
60
14.3
14 (12 recommended)
240
6400
240
3
3
60
15.4
14 (12 recommended)
240
9400
208
3
3
60
26.1
10
208
7960
220
3
3
60
20.9
10
240
9400
240
3
3
60
22.6
10
240
1-Phase Units
WATTS
VOLTS
PHASE
WIRES
CYCLE
AMPS
SUPPLY CONNECTION
HEATER RATED
HERTZ
WIRE SIZE (COPPER)>
VOLTAGE
6400
208
1
2
60
30.8
8
208
5440
220
1
2
60
25
10
240
6400
240
1
2
60
26.7
10
240
9400
208
1
2
60
45.2
6
208
> For supply connection use only copper wire suitable for at least 75° C (167° F).
C. STARTUP AND CHECKOUT
The Startup and Checkout procedure prepares a recently installed or repaired steamer for operation. The
procedures check proper installation and electrical connection of the steamer, and verify basic steamer
operation.
1. Installation Checkout
Use the Installation Checklist Table 4-2, to check the overall installation.
Table 4-2. Installation Check List
TASK
REFERENCE
COMPLETED
Preparation
Page No.
Verify electric power requirements
30
_____
Check operating location clearances
20
_____
Verify Field Assembly of Unit
24-26
_____
Verify Field Assembly of Stand (if applicable)
21-24
_____
Installation
Verify Steamer is Level
25
_____
Check drain line connection
26
_____
Check water supply connection
27
_____
Test water supply lines
29
_____
Check electrical line connection
29
_____
Perform Startup and checkout
31
_____
Notes on installation:
Table 4-1 Minimum Wire Requirements