Cleveland Range Steam Cooker and Rethermalization Unit 22CET3A User Manual

Page 35

background image

31

3-Phase Units

WATTS

VOLTS

PHASE

WIRES

CYCLE

AMPS

SUPPLY CONNECTION

HEATER RATED

HERTZ

WIRE SIZE (COPPER)

VOLTAGE

6400

208

3

3

60

17.8

12

208

5440

220

3

3

60

14.3

14 (12 recommended)

240

6400

240

3

3

60

15.4

14 (12 recommended)

240

9400

208

3

3

60

26.1

10

208

7960

220

3

3

60

20.9

10

240

9400

240

3

3

60

22.6

10

240

1-Phase Units

WATTS

VOLTS

PHASE

WIRES

CYCLE

AMPS

SUPPLY CONNECTION

HEATER RATED

HERTZ

WIRE SIZE (COPPER)>

VOLTAGE

6400

208

1

2

60

30.8

8

208

5440

220

1

2

60

25

10

240

6400

240

1

2

60

26.7

10

240

9400

208

1

2

60

45.2

6

208

> For supply connection use only copper wire suitable for at least 75° C (167° F).

C. STARTUP AND CHECKOUT

The Startup and Checkout procedure prepares a recently installed or repaired steamer for operation. The
procedures check proper installation and electrical connection of the steamer, and verify basic steamer
operation.

1. Installation Checkout
Use the Installation Checklist Table 4-2, to check the overall installation.

Table 4-2. Installation Check List

TASK

REFERENCE

COMPLETED

Preparation

Page No.

Verify electric power requirements

30

_____

Check operating location clearances

20

_____

Verify Field Assembly of Unit

24-26

_____

Verify Field Assembly of Stand (if applicable)

21-24

_____

Installation

Verify Steamer is Level

25

_____

Check drain line connection

26

_____

Check water supply connection

27

_____

Test water supply lines

29

_____

Check electrical line connection

29

_____

Perform Startup and checkout

31

_____

Notes on installation:

Table 4-1 Minimum Wire Requirements