Cleveland Range Steam Cooker and Rethermalization Unit 22CET3A User Manual
Page 28
24
d. Mounting the Upper Unit
7). Before setting the upper steamer into place over the spacer studs, place a bead of RTV
around the edge of the entire spacer outline.
8). Remove the side panels from the upper unit and set it onto the spacer. The ¼-20 studs of the
spacer should go through the ½” welded nuts normally used to secure the legs to the
steamer.
9). Secure the upper unit to the stand at the front pair of studs using the ¼-20 Lock Nut and
Washer provided (Figure 4-6).
e. Installing the Drain Between the Two Steamers
10).Assemble the drain fittings onto the steamers as shown in the schematic. Be sure to use a
suitable pipe dope compound or Teflon tape at all threaded pipe connections.
11). Lay the Drain hose (Figure 4-7 Item 8) out between the upper and lower hose fittings as it
may be necessary to shorten the length slightly depending on the fit-up of pipe
12).Put the Worm drive clamps over the hose and then install the hose between the two hose
fittings.
Figure 4-6 Mounting the upper unit
Drain Parts
Item
No.
Part
No.
Description
Qty
1 14369 Nipple, 1” NPT, Close, Black Iron
2
2
02573 Bushing, Hex, 1 ½” NPT x 1” NPT
2
3
111008 Nipple, ¾” NPT x 14”, Toe
1
4
03616 Coupling, Reducing, 1 ½” NPT x ¾” NPT,
Black Iron
1
5
20220 Tee, 1 ½” NPT, Male Run, Black Iron
1
6
110985 Fitting, 1 ½” Hose x 1 ½” NPT(M), Plated
2
7
102018 Clamp, Hose, Worm Drive
2
8
110984
1300
Hose, Black EPDM, 1 ½” ID x 13” long
1
9
20221 Tee, 1 ½” NPT, Black Iron
1
Supplied with the steamer not part of the kit
Figure 4-7 Drain Assembly