10

Step 2 — Plan for Sequence of Unit Installation

The support method used for this unit will dictate different

sequences for the steps of unit installation. For example, on

curb--mounted units, some accessories must be installed on

the unit before the unit is placed on the curb. Review the

following for recommended sequences for installation steps.

Curb--mounted installation —

Install curb
Install field--fabricated ductwork inside curb
Install thru--base service connection fittings (affects

curb and unit)
Rig and place unit
Remove top skid
Install outside air hood
Install smoke detector tube
Install combustion air hood
Install flue hood
Install gas piping
Install condensate line trap and piping
Make electrical connections
Install other accessories

Pad--mounted installation —

Prepare pad and unit supports
Rig and place unit
Remove duct covers and top skid
Install smoke detector return air sensor tube
Install field--fabricated ductwork at unit duct openings
Install outside air hood
Install combustion air hood
Install flue hood
Install gas piping
Install condensate line trap and piping
Make electrical connections
Install other accessories

Frame--mounted installation —

Frame--mounted applications generally follow the

sequence for a curb installation. Adapt as required to

suit specific installation plan.

Step 3 — Inspect unit

Inspect unit for transportation damage. File any claim

with transportation agency.

Confirm before installation of unit that voltage, amperage

and circuit protection requirements listed on unit data

plate agree with power supply provided.

Locate the carton containing the outside air hood parts; see

Figs. 5 and 12. Do not remove carton until unit has been

rigged and located in final position.

Step 4 — Provide Unit Support

Roof Curb Mount —

Accessory roof curb details and dimensions are shown in

Figs. 6, 7 and 8. Assemble and install accessory roof curb

in accordance with instructions shipped with the curb.

NOTE: The gasketing of the unit to the roof curb is critical

for a watertight seal. Install gasket supplied with the roof
curb as shown in Figs. 6, 7 and 8. Improperly applied gasket
can also result in air leaks and poor unit performance.
Curb should be level. This is necessary for unit drain to

function properly. Unit leveling tolerances are show in

Fig. 9. Refer to Accessory Roof Curb Installation

Instructions for additional information as required.

Install insulation, cant strips, roofing felt, and counter

flashing as shown. Ductwork must be attached to curb and

not to the unit. Thru--the--base power connection must be

installed before the unit is set on the roof curb. If

field--installed thru--the--roof curb gas connections are

desired remove knockout in basepan located in the gas

section, see Fig. 5 for location. Gas connections and

power connections to the unit must be field installed after

the unit is installed on the roof curb.

If electric and control wiring is to be routed through the

basepan, remove knockouts in basepan located in control

box area of access panel; see Fig. 1, 2, or 3 for basepan

knockout locations for location. Attach the service

connections to the basepan.

Control Box

Access Panel

Filter and

Indoor Coil

Access Panel

Indoor Blower

Access Panel

Gas Heat

Access Panel

Compressor

(each side)

Hood Carton Location

(rear access panel)

C11154

Fig. 5 -- Typical Access Panel and Compressor Locations

Slab Mount (Horizontal Units Only) —

Provide a level concrete slab that extends a minimum of

6–in. (150 mm) beyond unit cabinet. Install a gravel apron

in front of condenser coil air inlet to prevent grass and

foliage from obstructing airflow.
NOTE: Horizontal units may be installed on a roof curb
if required.
Alternate Unit Support (In Lieu of Curb or Slab

Mount) —

A non--combustible sleeper rail can be used in the unit

curb support area. If sleeper rails cannot be used, support

the long sides of the unit with a minimum of 4 equally

spaced 4--in. x 4--in. (102 mm x 102 mm) pads on each

side. Locate pads so that they support the rails. Make sure

to avoid the fork openings.

48H

C