beautypg.com

3 sequence of automation functions – AERCO Belimo Motorized Valves Installation User Manual

Page 19

background image

PR2: 08/02/12 Page 19 of 20

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, New York 10913 • Phone: 800-526-0288

Installing Belimo Motorized Valves on AERCO Benchmark Boilers

Technical instruction Document

TID-0028_0C





6.3 Sequence of Automation Functions

1. When a boiler is in demand, its Aux Relay will close, signaling the BAS. The Aux Start On Delay

timer starts.

2. The BAS opens the MOV of the corresponding boiler.
3. When the valve has fully opened, its proof of open switch is made, closing the delayed interlock

of the boiler — allowing the boiler to fire.

4. When the demand is satisfied on a corresponding boiler, the BAS will keep its valve open for at

least 2 minutes before closing.

5. When there is no more demand from the entire system (all boilers are off), the BAS will open all

boiler MOVs.

6. The next time there is a demand on a boiler, this sequence repeats and the BAS closes the MOV

of the other boilers that have no demand.
















NOTE

For complete wiring connections, see Belimo’s Installation and Maintenance Instructions shipped with the

valve and also available online at:

http://www.belimo.us/belimo/media//Instructions/Installation/BFV_Instruction_Sheet.pdf