Site preparation, Precautions, Principle #1 – Hardy HI LPRE05 Shear Beams User Manual
Page 11

OPERATION AND INSTALLATION MANUAL
Page 5
Site Preparation
•
All mounting surfaces for the base and loading
plate must be level. The distance between the
mounting surface of the loading plate and base
must be within 1/32” of the nominal height, “H”.
The Load Point Assemblies in a system must be
level to within +/- 0.5
o
.
•
When mounting the base plate on concrete, use
grout to level the plate.
•
Do any welding before installing the load points.
•
Provide proper drainage to prevent the load point
assembly from standing in water.
Precautions
•
Always treat the Load Sensor as a precision
instrument. Leave the load point assembly in its
packaging until it is time for installation.
•
NEVER CARRY OR SWING THE LOAD SEN-
SORS BY THEIR CABLES.
•
Never allow moisture to get into any interconnec-
tions.
•
HARDY SOLUTIONS RECOMMENDS THAT
YOU DO NOT CUT YOUR ADVANTAGE
®
OR ADVANTAGE LITE® LOAD SEN-
SOR CABLE. BECAUSE YOUR C2®
ACCURACY WILL BE AFFECTED AND
THE WARRANTY VOIDED.
Basic Engineering
Principles for Positioning
Load Point Assemblies
Principle #1
•
Position the Load Points Assemblies so that the
load (weight) is distributed as evenly as possible
between each load point assembly in the scale.
•
When the installation does not allow even distri-
bution of the load, select higher capacity load
point assemblies.
NOTE:
All load point assemblies must have the same capacity
when used in one scale.