Hardy HI LPRE05 Shear Beams User Manual
Hardy Scales
![background image](/manuals/657653/1/background.png)
HI HLPS SERIES
LOAD POINT ASSEMBLIES
OPERATION AND INSTALLATION
MANUAL
Corporate Headquarters
9440 Carroll Park Drive, Suite 150
San Diego, CA 92121
Phone: (858) 278-2900
FAX: (858) 278-6700
Web-Site: http://www.hardysolutions.com
Hardy Process Solutions Document Number: 0596-0237-01 Rev G
Copyright 1999-2013 Hardy Process Solutions All Rights Reserved. Printed in the U.S.A. (941028)
This manual is related to the following products:
Table of contents
Document Outline
- HI HLPS SERIES
- LOAD POINT ASSEMBLIES
- OPERATION AND INSTALLATION
- MANUAL
- Local Field Service
- Outside the U.S
- General Information
- Three Load Point Types
- Unpacking
- Installation of the Ground Strap
- Site Preparation
- Precautions
- Basic Engineering Principles for Positioning Load Point Assemblies
- Typical Mounting Arrangements
- Round Vessel with 3 Load Point Assemblies
- Round Vessel with 3 Load Point Assemblies - Angle Config. #1
- Round Vessel with 3 Load Point Assemblies - Angle Config. #2
- Square Hopper with 3 Load Point Assemblies - Even Load Distribution
- Square Hopper with 3 Load Point Assemblies - Uneven Load Distribution
- Round Vessel with 4 Load Point Assemblies
- Typical 4 - Load Point Assembly Installation
- Typical 6 - Load Point Assembly Installation
- Level Requirements
- Stiffness
- Installation Procedures
- Adjusting the Anti-Lift Off Device
- Replacing the Load Sensor
- Troubleshooting
- Electrical Termination Cable Color Codes
- Model Numbers
- Specifications