beautypg.com

Cub Cadet U-Channel Beam Style User Manual

Page 57

background image

Tank and Tires

53

14.

Remove the wheel assemblies by following the pro-
cedures described in the wheel assembly section of
this chapter.

15.

Remove the fenders by following the procedures
described in the fender section of this chapter.

16.

Remove the two nuts and bolt that hold the tongue to
the tank using a pair of 9/16” wrenches.
See Figure 7.5.

17.

Slide the tongue out of the tank.

18.

Remove the vertical locking rod by following the pro-
cedures described in the vertical locking rod section
of this chapter.

19.

Install the tank by following the previous steps in reverse order.

20.

Fill the reservoir with either Dexron III ATF or SAE 10WAW (ISO 32 viscosity grade) hydraulic fluid. Do not mix
the two.

21.

Start the log splitter.

22.

Cycle the ram 12 times to purge air from the hydraulic system.

23.

Test run the splitter in a safe area before returning it to service.

Figure 7.5

Tongue