beautypg.com

4 installation guide, 1 preparations – COP-USA CD55-SDI-IRWPTK User Manual

Page 12

background image






11

 

4 Installation Guide 

 
4.1 Preparations 
 

1) Basic Requirements 
 
All the electric work must be finished under the latest electric & fire prevention 
law and rules (and any related law and rules). Please check according to the 
packing list if every accessory is included. And also make sure the installation is 
operated as required. Please contact us for any help during the installation. 
 
2) Installation Space and Density Checkup 
Please make sure the space is big enough to install our dome. And also ensure 
the density of the ceilings or walls to hold total weight of the dome and its 
accessories. 

 

3) Cables Preparation 
Please choose the proper cable according to the transmission distance. The min 
requirement of coaxial BNC cable is listed as follows for reference: 
4) Setup Dip Switch for Dome Address 

*Please  turn  to 
Part 5 for details. 

 

Models 

Max Distance(Feet\Meter) 

RG59/U 

750ft(229m) 

RG6//U 

1,000ft(305m) 

RG11/U 

1,500ft(457m)