Ul ac – Checkline DTMB User Manual
Page 5

5
4.00 QUICK START INSTRUCTIONS
4.10 Setup
1. Insert a sample of the process material into the Thickness Compensator and
secure the ends of the sample under the Sample Holding Clips on each side
of the unit.
Note: Thickness Compensator is not used on the DTMB-200 Model.
2. Set the Field Calibration Adjustment to "STD”
4.20 Operation
1. Turn the unit on by pressing the
key. Display should show zero
when unit is in measuring position. If
the gauge displays zero go to Step 3,
otherwise perform a Gravity Correction
Procedure (Step 2).
2. Position the DTMB into the measuring
position and perform a Gravity
Correction procedure (Zero):
Press the and keys
simultaneously, and hold until the
display shows “0” or “0.0”.
POWER
EXIT
POWER
EXIT
RECALL
20
8.23 Low Battery
When the BATT indicator appears on the
display, the batteries are low. Data will be
lost when the batteries are removed.
8.30 Options
8.31 Ultra-High Speed Roller Assemblies
For line speeds up to 5,000 m/min., specify
“U” roller guides.
8.32 Lever
For high tension ranges, specify an “L”
Lever attachment to make it easier to push
the outer rollers forward for material
acquisition.
8.33 AC Adapter.
Use this adapter during long-term, on-line
measurements to save battery power.
Connects to 115 VAC power sources.
BATT indicator appears on
display.
U
L
AC