Warning, Heating element and air channel installation – Steffes 6140 User Manual
Page 14
![background image](/manuals/654363/14/background.png)
Step 1 After all brick are loaded, insert the heating elements between the brick layers, sliding them in until the
element ends embed into the side cutouts of the brick cavity.
The elements MUST be installed so their threaded screw tabs on the wire connection terminals point
forward and down. If they are installed with the screw tabs pointing upward, element-to-wiring harness
connections will be difficult. Elements must be slid into the brick
core properly to ensure correct clearance between the terminal
connections and any surfaces within the system. Refer to the
required element connection clearance information in Figure 6.
Step 2 Install the front air channel with the air deflectors (arrow shaped
pieces) facing inward and with the narrow ends of the deflectors
pointing up. Place bottom portion in first (Figure 5).
Step 3 Lower the insulation blankets back into position, one at a time.
Carefully tuck the sides of the insulation into the edges, corners, and
around the exposed portions of the heating elements to ensure
maximum efficiency.
Step 4 Reinstall the galvanized front panel and secure it to the system using
the screws that were originally removed. Slide the bottom of this
panel inside the lower lip of the brick cavity. The top rests on the
outside of the cavity.
Step 5 Remove the electrical panel cover and locate the element screw kit.
Step 6 Carefully route wiring harnesses and connect them to the heating elements, using screws provided in the
hardware package. Make connections with screw heads up and threads pointing down. Element screws
should be tightened to 20 inch lbs. Refer to Element Installation (Figure 6) for proper positioning.
Step 7 The brick core temperature sensor must be installed prior to putting the painted front panel in place.
HEATING ELEMENT AND AIR CHANNEL INSTALLATION
Installation
n
3.05
Comfort Plus Commercial
Installation
AIR CHANNEL PLACEMENT
FIGURE 5
3
4
"
Required Clearance Between
Element Termination and Metal
Panels is 1/2" (3/4" Nominal)
Element Connection
ELEMENT INSTALLATION
FIGURE 6
TOP VIEW
HAZARDOUS VOLTAGE: Risk
of electric shock. Can cause
injury or death.
w DO NOT remove the electri-
cal panel cover while
system is energized.
w Position elements properly
to avoid short circuiting
them against metal sur-
faces.
w Protect element lead wires
from front panel screws
and any field installed
screws to avoid short
circuit.
WARNING