Ia-mkdl-300-cc – Cleveland Range IA-MKDL-60-CC User Manual
Page 37

________________________________________________________________________
IA-MKDL-300-CC
•
Make sure kettle is level, equipment can move as floors settle
•
Make sure kettle is bolted securely to floor, bolts may loosen after
time
•
Check the incoming power and amp draws (per rating plate)
•
Check incoming air pressure (_” line 1cfm @ 90psi.)
•
Check air pressure regulator/collector for draw off valve (45psi.)
•
Check air pressure regulator for kettle jacket purge (15psi.)
•
Check air collector regulator for moister, dirt (Must be clean & dry)
•
Check all o-rings and shaft seal for wear and proper lubrication
•
Check the installation 3” Flush Piston Draw Off Valve
•
Check all air hoses for leaks and signs of wear
•
Check incoming steam pressure (3/4”line / 320PPM / 65psi.)
•
Check the steam trap for proper operation (clean or replace if
needed)
•
Check the operation of safety valve 100psi. rating
•
Check for steam leaks (Inlets and Returns)
•
Check for the proper clearance where drive shaft penetrates the
kettle
•
Make sure temperature sensor is properly installed
•
Check chill water supply and return lines for leaks.
•
Check the control panel for any signs of corrosion moisture
•
Check the complete operation of all kettle controls
•
Check the mixer operation (Speed control, Emergency stop)
•
Check the idler bearing and idler busing for wear
•
Check the kettle tilt (up and down)
•
Check hydraulic fluid level
•
Check hydraulic lines for leaks and signs of wear
•
Change hydraulic fluid yearly (ISO 46 20 weight Food Grade)
•
Grease tilt mechanism monthly (Food grade grease)
•
Check the operation of 3” Flush Piston Draw Off Valve
•
Check water meter operation
•
Make sure the Partlow chart recorder/controller is (controlling,
reading, and charting correctly)
•
Check the cooking operation in both automatic and in manual modes
•
Check the operation of gentle heat mode
•
Check the operation of the chill mode
•
Check kettle cover hinge tension and fasteners