Line data input, When line length is known), Attention – Daiwa SEABORG-1000MT User Manual
Page 12
10
Line data input
(When line length is known)
This method is used when the line length is known before winding. In the example below,
PE 6 – 1000m is wound.
1.
Run line through the levelwind guide and tie it onto the spool.
The levelwind threader makes this process easier. Make sure to
tie the line onto the pin found on the spool to avoid the line
slipping.
2.
Move the power lever to the OFF position.
6
3.
Connect the clip to the power source (12V DC).
4.
Attach the cord connector to the reel.
See in page 2 for the connection method.
5.
Press the
MODE SETTING BUTTON
and hold for five seconds,
until the display shows
0.0
.When the button is released, the
display will then change to the figure on the left, which shows
P1
.
Tension indicatar
Attention
If the line is wound indoors at a low speed and with a high tension for a long period of time,
the motor will be overheated, which may cause motor failure.
This issue does not need to be considered during fishing because the motor will be cooled
by sea water.
If winding stops, wind up the line manually before entering any figure.
Make sure the drag is set firmly.
Levelwind Guide
Main line
Pin
Power lever
1
5
2
6.
Push the power lever forward to maximum and wind the line to
its end.
For your safety, shift to the power range mode before beginning to
wind line. You can still adjust winding speed.
Before winding line, use the Power Lever to adjust the tension
setting displayed at the bottom left of the display panel.
Adjust to 4-5 for the Power range mode and 6-8 for the Speed
range mode.
As the power lever is moved forward, the
P1
display
changes to a tension indicator.