7. Rotate the motor by hand using a socket wrench, the belt should track straight and away from motor but not
off of the front pulley. Be sure to red loctite front engine nut and torque to HD specifications. (Electric impact is
preferred). (Fig. 8)

Fig. 8

with seal for all spline shaft models 1990 and later.

9. Install sealed mainshaft nut supplied with 1990-up kits only. For 1986-89 you must use stock hub nut and the

before installation. (Fig. 9)

Fig. 9 Install sealed mainshaft nut supplied with 1990-up kits only. For
1986-89 you must use stock hub nut and the seal kit enclosed with kit.

to nut before installation.

Pictured here is the seal kit installation which is supplied
with all 1986-89 belt drives only. A sealed hub nut is
supplied with all kits 1990- up. A stock HD hub
nut with seal must be used with all 1983 and earlier kits.

10. Install clutch pack, refer to schematic (below) spline steel first, 1/2 sided friction plate with fiber facing out,
then alternate steel and two sided fiber plates ending with the other 1/2 sided friction plate with fiber facing in. If

4

8. Apply

Loctite® to and install and tighten to HD specifications, mainshaft hub nut. We supply a special hub nut

seal kit enclosed with kit. For Shovelhead you must use the stock hub nut with seal. Apply

Loctite® to nut

For Shovelhead you must use the stock hub nut with seal. Apply