beautypg.com

The control panel and powering on, 3d smartone – Xpres 3D SMARTone User Manual

Page 7

background image

3D SMARTone

 INSTALLATION AND OPERATION

 

 

5. The Control Panel and powering on 

 

 

 

 

Flick the red power switch to start the SMARTone 

The SMARTone will now begin a ‘warming up’ cycle to bring the drawer and jig up to operating temperature.  

Initial warm‐up will take around 15 minutes.   

The

 

SMARTone will not run a decoration cycle unless it is at operating condition. 

Once at operating condition the

 

SMARTone will maintain this so that it is ready to use, even if you leave it idling for an extended 

period of time.  

To ensure that the press is always ready keep the drawer closed when not in use.