C-1 0.00 – Torbal BAS Series User Manual
Page 9

- 8 -
1. Carefully remove the crane scale, ac adapter, as well as the remote control and antenna (optional) out
of the packaging.
2. After removing all of the components, place the crane scale on a table top surface.
3. Using scissors cut the plastic tie straps which secures the hook during shipping.
4. If an optional remote control is purchased, mount the remote antenna onto the
crane scale by firmly screwing it into the antenna port located on the left side.
5. After assembling the unit, plug in the AC adapter to the AC adapter socket
located on the right side the scale. Leave the adapter plugged in for
minimum of 3 hours in order to charge the scale’s internal battery.
6. Once the battery has been charged the scale maybe installed.
Before installing the scale make sure that the scale’s hook is
in place, and firmly secured with two locking retaining rings
located on both sides of the hook shaft.
7. When mounting take extra caution and make sure that your mounting method will support a load
which is equal to twice the weight of the scale’s maximum weighing capacity.
Improper mounting of the crane scale can result in having the unit fall from
its mounted height and can cause serious injury or death.
8. After installing the scale, the unit can be turned on by pressing the power ON key (
).
9. To turn the scale OFF press the Power “OFF” button (
).
Chapter 5: Unpacking the Balance and Getting Started
C-1
0.00