0 scale installation, 1 overview, 2 site preparation – Rice Lake Bariatric Wheelchair Scale (SB-1150) User Manual
Page 7: 3 unpacking

SB-1150 Installation & Operation Manual - Scale Installation
3
3.0
Scale Installation
The following sections describe the correct installation procedures when installing the Summit SB-1150 Bariatric
Wheelchair Scale.
3.1
Overview
Standard installation of the Summit SB-1150 Bariatric Wheelchair Scale consists of the following steps:
1. Select a site.
2. Unpack the scale and pit frame.
3. Install the pit frame.
4. Lower the scale into pit frame.
5. Adjust the four leveling feet on the scale.
6. Connect cable to the indicator.
7. Calibrate the scale.
3.2
Site Preparation
The scale must not be loaded beyond its capacity, even momentarily. Avoid areas where the scale might receive
damaging side impacts from wheels, or shock damage from falling objects. Avoid areas where water may
damage a scale not meant for a washdown environment.
The interface cable between the scale and the indicator must be protected against crushing, cutting, or moisture
damage. If the chosen site has such potential dangers, some method of protection, such as running the cable in
conduit, is necessary.
In operation, the scale must be level within 1/4". Either choose a site where the floor is close to this standard to
avoid excessive shimming, or modify the floor at the chosen site to meet this standard.
3.3
Unpacking
Remove all packing material and visually inspect the scale and pit frame for visible damage caused during
shipment. The shipping container should contain the scale, pit frame, scale feet, this manual, the indicator, and a
10-ft length of load cell cable.
The Summit SB-1150 Bariatric Wheelchair Scale has one threaded eyebolt hole located in the center of the deck
to allow installation of an eyebolt hook for use when lifting the scale with chains. It’s recommended to use a 1/2
in-20NF eyebolt to lift the scale.
Figure 3-1. Proper Lifting Technique