Assembly and Installation
5.
Connect the AC power cord to the IEC connector on the back of the
HI-6100 Field Monitor. Verify the power supply switch is in the ON
position.
6.
Plug the other end of the power cord into an electrical outlet.
7.
Turn on the battery powered probe(s).
8.
Turn on the power switch on the front panel. It may take several
seconds for the display to appear.
9.
To display the probes attached, press the Find All Probes key on the
main menu of the display screen to see information for all of the
probes.
L
ASER
P
ROBE
S
ETUP
1.
Remove the plastic dust caps from the appropriate DEVICE
INTERFACE CHANNEL located on the back of the HI-6100. Save all
protective caps and covers for future use. Clean transmit and receive
ports using canned dry air.
2.
Remove the dust caps from the probe and follow the instructions on
page 14 to clean the fiber connectors. If extension cables and
bulkhead feedthrough connectors will be used, clean as described.
Connect the fiber optic cable to the selected DEVICE INTERFACE
CHANNEL. Both the FC and the ST connectors are keyed.
3.
Connect the AC power cord to the IEC connector on the back of the
HI-6100. Verify the power supply switch is in the ON position.
4.
Plug the other end of the power cord into an electrical outlet.
5.
Turn on the power switch on the front panel. It may take several
seconds for the display to appear.
6.
To display the probes attached, press the Find All Probes key on the
main menu of the display screen to see information for all of the
probes.