beautypg.com

ETS-Lindgren 2175 Antenna Tower User Manual

Page 22

background image

22

|

Assembly and Installation

L

OCATION OF

C

ONNECTIONS

,

C

ONTINUED

Figure 8: Location of Connections

11. Coiled hoses that were located inside the carrier should be connected to the fittings

on the platform for the polarization to become operable. All connections to the motor

base should be completed at this time including fiber optic limits and control lines,

along with compressed air and electrical power. Route all connections through the

connection entry on the platform tube so they will exit through the connection exit.

Install the platform end covers by positioning and applying pressure to secure them in

place. Check to see that the controller reads horizontal polarization.