beautypg.com

ETS-Lindgren 2175 Antenna Tower User Manual

Page 20

background image

20

|

Assembly and Installation

Outdoor applications require guying to stabilize the mast against wind. For

outdoor applications, engage the lock on the swivel casters at this time.

Figure 7: Boom Placement

10. Pull the coiled hose out of the carrier and insert the primary boom as pictured into the

carrier. Note the position of the knobs on the boom gear and on the boom bearings.

The gear back-up roller should be directly behind the rack gear and the cylinder

should be in a fully compressed state. Incorrect horizontal and vertical polarization

angles will result if the cylinder is not fully compressed. Once the primary boom is

locked in place, install the offset boom and the coaxial cable strain relief.