C. The sequence of erection should be coordinated with the project

superintendent to prevent delays and minimize the risk of material

damage. IF PRESET ANCHORS ARE REQUIRED, COORDINATE
WITH THE GENERAL CONTRACTOR AND SUPERVISE THE LOCATION.

finished surface and the wrapping material.

materials be allowed to dry or permanent staining will occur.

plaster, and other materials from coming in contact with and

as established by the architectural drawings and the general

soap before hardening. Under no circumstances should these

and other construction trades in adjacent areas of the job site.

are recommended to assure early acceptance of your products and

ponents so material will not become scratched or rubbed at points
of contact. Store off the ground. Protect against weather elements

A. REVIEW THE APPROVED SHOP DRAWINGS to become thoroughly familiar

alignment and relationships to benchmarks and column center lines,

HANDLING/STORING/PROTECTING ALUMINUM - The following precautions

A. HANDLE CAREFULLY - Store with adequate separation between com-

B. KEEP MATERIAL AWAY FROM WATER, MUD, AND SPRAY - Prevent cement,

damaging the finish. Do not allow moisture to be trapped between the

C. PROTECT MATERIALS AFTER ERECTION - Wrap or erect screens of plastic

sheeting. Cement, plaster, terrazzo, and other alkaline materials are
very harmful to the finish and must be removed with water and mild

GENERAL GUIDELINES - The following practices are recommended for all

B. INSTALL ALL FRAMING MATERIALS PLUMB, LEVEL, AND TRUE - Proper

CONJUNCTION WITH THOSE DRAWINGS.

THESE INSTALLATION INSTRUCTIONS ARE A SUPPLEMENT TO
THE APPROVED SHOP DRAWINGS AND MUST BE USED IN

SECTION I: GENERAL NOTES AND GUIDELINES

with the project.

contractor, must be maintained.

2.

1.

installations.

workmanship.

NOTE: