removed and the ends extend freely into the vertical mullion cavity.
STEP #1 INSTALL CONDENSATION WICK
insert about 1 1/2" of each end of the condensation wick into the hole
wick into the wick pocket, leaving each end free. Using a needle nose pliers,
the horizontal. Using the deglazing tool, press about 6" of the condensation
approximately 3" longer than the center line dimension of the vertical mullions.
To install the condensation wick into the horizontal, first cut the wick
Locate the approximate center of the condensation wick and the center of
provided in each vertical mullion. Starting at the middle of the horizontal
the horizontal pocket. Continue this process until all the slack has been
and working toward the verticals, press the remaining condensation wick into
SECTION IV: CONDENSATION WICK INSTALLATION
INSERT APPROXIMATELY
1 1/2" OF EACH END
OF THE CONDENSATION
THE VERTICAL MULLIONS.
burn each end of the wick and
condensation wick into the vertical,
Note: To facilitate insertion of the
insert with needle nose pliers.
WICK INTO THE HOLE IN
CONDENSATION
WICK