SECTION VIII: EXTERIOR GASKET INSTALLATION CONT.

corners at the intersections of the vertical and horizontal members.

The gasket surface should be smooth when fully installed. Both a visual and

fully engaged in the retainer pocket continuously along the gasket length,

STEP #5 FINAL GASKET INSPECTION

"by feel" inspection of the gasket should be made to ensure that the dart is

including the corners. All corners should be pushed into alignment with other

stall the gasket by dividing the remaining loose gasket material in half and
work it into the gasket retainer pocket. See illustration "C" below. Continue
until the entire length of gasket is engaged in the retainer pocket at all

A

C

sides. See illustration "D".

INSTALLATION

CORNER

B

D

L

C

INSTALLATION

CENTER

C

L

retainer pocket at this half point. See illustration "B" below. Continue to in-

opening. Use the #HM46 mallet to engage the gasket dart into the gasket

Align the center of the linear sides of the gasket with the center line of the

STEP #4 STEP BY STEP GASKET INSTALLATION

9/2000

PAGE 14