Connecting the dyno – Dynojet 250ix: Pre-Installation Guide User Manual
Page 44
Pre-Installation Guide for Model 200i/250i, 200iP/250iP, 250iX, and 250iPX Motorcycle Dynamometers
A P P E N D I X B
Locations Using 60 Hz Power (North America and Japan)
B-6
C
ONNECTING
THE
D
YNO
1
Turn off the main circuit breaker on the dyno. The main breaker is located in the
CPI door. Off is the down position.
2
Once you verify the voltages on the receptacle, connect the dyno to the
receptacle.
3
Connect the high pressure blowers to the dyno. For more information on
connecting the blowers, refer to your dyno installation guide.
4
Turn on the main dyno breaker.
5
Test the blowers for operation.
6
Turn on the dyno electronics and verify operation.
7
Test the control panel operations. For more information, refer to your dyno
installation guide.
This manual is related to the following products: