Copernicus IS2 User Manual
Page 10

IS2 - Version A - Released 02 August 2013 - Copernicus Educational Products Inc.
?
Place an empty hardware bag over the
frame to prevent the unit from being
scratched
?
Hooks snap onto the frame easily
?
Slide bag free once the hook has been
snapped onto the frame.
Snap
Place bag
here for
protection
8
Attach Chart Paper Hooks
Chart Paper Hooks x 2
You will need:
(Not to Scale)
9
Install Book Ledge
?
Note: There are multiple locations on the
side of the Whiteboard to install the Book
Ledge. Choose the location that works for
your classroom.
?
Insert one hook into the appropriate hole
on one side of the Whiteboard Frame.
?
Pull out the opposite hook & snap into
corresponding hole.
Book Ledge x 1
You will need:
(Not to Scale)
Note: The spring tension
is designed to discourage
children from unhooking
the Book Ledge.
!
10