beautypg.com

58mc b – Carrier 58MCB User Manual

Page 12

background image

12

115-V FIELD-

SUPPLIED

DISCONNECT

AUXILIARY

J-BOX

24-V

TERMINAL

BLOCK

THREE-WIRE

HEATING-ONLY

FIVE WIRE

NOTE 1

NOTE 2

FIELD-SUPPLIED

DISCONNECT

CONDENSING

UNIT

TWO

WIRE

FURNACE

C

O

N

T

R

O

L

R

G

COM

W

C

R

G

Y

GND

GND

FIELD 24-V WIRING

FIELD 115-, 208/230-, 460-V WIRING

FACTORY 24-V WIRING

FACTORY 115-V WIRING

208/230- OR

460-V

THREE

PHASE

208/230-V

SINGLE

PHASE

BLOWER DOOR SWITCH

WHT

BLK

WHT

BLK

NOTES:

Connect Y-terminal in furnace as shown for proper blower operation.

Some thermostats require a "C" terminal connection as shown.

If any of the original wire, as supplied, must be replaced, use

same type or equivalent wire.

W

Y

GND

THERMOSTAT

TERMINALS

1.

2.

3.

A02174

Fig. 15 -- Field Wiring

BL
W

NUETRAL

ST
A

TUS CODE LED

SEC-2 SEC-1

EAC-2 L2

FUSE 3-AMP

0.5 AMP@24VAC

HUM

TEST/TWIN

G Com

W

Y R

24V

120 180

90 150

BLOWER OFF-DELAY

PL
T 1

COOL HEA

T

SPARE-1 SPARE-2

EAC-1

1-AMP@

115VAC

PR-1

L1

PL2 1

24-V THERMOSTAT

TERMINALS

3-AMP FUSE

LED OPERATION &

DIAGNOSTIC LIGHT

115-VAC(L2)NEUTRAL

CONNECTIONS

COOL

HEAT

SPARE-1

SPARE-2

BLOWER SPEED

SELECTION TERMINALS

EAC-1 TERMINAL

(115-VAC 1.0 AMP MAX.)

115 VAC (L1) LINE

VOLTAGE CONNECTION

PL2-HOT SURFACE

IGNITER & INDUCER

MOTOR CONNECTOR

PL1-LOW VOLTAGE MAIN

HARNESS CONNECTOR

TRANSFORMER 24-VAC

CONNECTIONS

HUMIDIFIER TERMINAL

(24-VAC 0.5 AMP MAX.)

TWINNING AND/OR
COMPONENT TEST

TERMINAL

BLOWER OFF-DELAY

J2

J2 JUMPER

PL
T

A02100

Fig. 16 -- Control Center

58MC

B