beautypg.com

Useful information, Installation, Preliminary operations – Carlo Gavazzi WM3-96 User Manual

Page 42: Before mounting the modules, List of the available variables, What is asy, Position of the modules

background image

43

List of the available variables:

Useful information

What is ASY?

41

38

Position of the modules

47

The availability of the variables depends on the
type of electrical system being selected.

INSTALLATION

Preliminary operations

Before switching the instrument on, make sure that the power
supply voltage corresponds to what is shown on the side label
of the relevant module. Example:
AP1020, Universal power supply
input range: 100V...240V DC/AC (50Hz -60Hz)
power consumption: 12W / 30VA 1 PHASE
serial number: S/N 002700/20345

Before mounting the modules

Each module (input, output and power supply) must be
mounted in the proper slot: each module has been conceived
to be mounted in one slot only. To know in which slot every
module is to be mounted, refer to the figure on page 45.

V 1

L

n

A

3

L

A

V

D

H

T

ll

2

V

3

A

D

H

T

2

L

V

1

L

W

A

V

D

H

T

I

2

V

D

H

T

I

I

3

A

3

L

V

2

L

W

1

L

F

P

3

V

D

H

T

D

H

T

I

3

A

N

-

L

V

3

L

W

2

L

F

P

D

H

T

ll

3

V

d

m

d

n

A

2

-

1

L

V

W

3

L

F

P

D

H

T

l

3

V

d

m

d

A

V

3

-

2

L

V

1

L

r

a

v

F

P

1

A

D

H

T

g

v

a

F

P

1

-

3

L

V

2

L

r

a

v

z

H

D

H

T

ll

1

A

d

m

d

W

V

3

L

r

a

v

1

V

D

H

T

D

H

T

l

1

A

Y

S

A

1

L

A

r

a

v

D

H

T

ll

1

V

2

A

D

H

T

2

L

A

1

L

A

V

D

H

T

l

1

V

D

H

T

ll

2

A

3

L

A

2

L

A

V

2

V

D

H

T

D

H

T

l

2

A