Re-install strainer support, Position air pipe, Install upper pipe support – Great Plains 401-516A Installation Instructions User Manual
Page 13

Great Plains Manufacturing, Inc.
Installation Instructions
11
12/28/2007
401-514M
Re-Install Strainer Support
Refer to Figure 12 (which depicts a 403-143K hopper)
37. Select the eight sets of saved:
802-005C HHCS 1/4-20X1 GR5
804-007C WASHER FLAT 1/4 SAE PLT
803-230C NUT HEX FLANGE 1/4-20 PLT
38. Position the drilled strainer support
with the notch
to the hopper latch side and the new holes to the
rear. Place a washer
on each bolt
. Insert bolt
from above and secure with nut
Position Air Pipe
39. With the upper pipe support
at hand,
select one new:
403-403D 82 BU AIR PRESSURE PIPE
and two sets of:
802-017C HHCS 3/8-16X1 GR5
804-013C WASHER LOCK SPRING 3/8 PLT
803-014C NUT HEX 3/8-16 PLT
40. Insert the pipe into the hopper and slide it over the
lower pipe support weldment. Temporarily lean it
against the back of the hopper.
Install Upper Pipe Support
Refer to Figure 13
41. With the bolts
at hand,
swing the pipe
back into the opening,
place the upper support
on the pipe, with the
bracket forward.
42. Swing the pipe and support to the back of the hop-
per, so that the bracket edge is under the rear span
of strainer support
43. Align the holes in the two brackets and secure them
with the bolts
, washers
and nuts
44. Skip to “Closeout” on page 14.
Figure 12:
Insert 82 bu Pipe
27363
U
D
L
R
B
F
Figure 13:
Install Upper 82 bu Support
27365
U
D
L
R
B
F