beautypg.com

Operator’s manual – Great Plains DICKEY-john IntelliAg Planter-Drill Control L1 User Manual

Page 13

background image

OPERATOR’S MANUAL

IntelliAg PDC User Level 1 (GP)

11001-1508-200903

SYSTEM OPERATION / 11

DELAY TIME

Delay Time determines the length of time before a control channel will start
after the master switch has been turned ON.

• The system will immediately shutdown the channel when the ground

speed is less than the shutoff speed.

• The system will delay the channel shutdown if the master switch is

turned OFF and the ground speed is greater than the shutoff speed.

The rate instrument will populate with the word “DELAY” and the countdown
timer appears on the screen indicating when the channel will turn ON
(

Figure 5

).

FLUSH ENABLE

NOTE: Flush Enable will abort if the

button is pressed during a
Precharge state.

The Flush Enable feature is typically used to begin dispensing material at a
higher rate when the tractor is below shutoff speed, i.e. during startup or
turn around conditions. Material will dispense at the target rate for the
speed under the Ground Speed Setup screen.

Flush enable is applicable to granular seeding, fertilizer, or liquid control
channels.

Figure 6
Flush Enable (Main Work Screen)

NOTE: Precharge, Delay Time, and

Flush Enable are features that
only function if configured in
Setup mode and established
under User Level 2.

Operating the Flush Enable function:

1. Ensure the master switch is turned ON and ground speed is below

shutoff speed.

2. Press and hold the Flush Enable button to dispense material.
3. Release the Flush Enable button to stop dispensing material. Once

speed is above shutoff speed, flush is aborted and ground speed
based control will take over.

FLUSH

300

FLUSH

Press and hold
Flush to activate

FLUSH