10

Any

Controlled Ferro

Shop Charger

Phase 1: Constant current at the start rate until the float voltage is reached or for the total run time.

HF

Phase 2: Constant voltage at the float voltage for the remainder of the total run time.

Phase 3: not used.

Phase 4: not used.

*Additional Settings: start rate = SA parameter.

float voltage = SV parameter.

total run time = ST parameter.

11

Geltec/Crown gel

Controlled Ferro

Special

Phase 1: Constant current at 16A/100Ah until 2.40v/c.

HF

Phase 2: Constant voltage at 2.40v/c until the current falls to 1.5A/100Ah or 6 hours.

Phase 3: Constant current at 1.5A/100Ah for the remainder of the 6 hours from phase 2.

Phase 4: not used.

12

Flooded

Controlled Ferro AGV Trickle Charge Phase 1: Constant current at the start rate until 2.40v/c.

Lead-Acid

HF

Phase 2: Constant voltage at 2.40v/c until the current falls to 1A/100Ah or dvdt.

Phase 3: Constant current at 4.5A/100Ah until 2.65v/c or 3 hours if manual equalize selected.

Phase 4: Constant voltage at 2.25v/c as long as the battery is connected.

*Additional Settings: start rate = SA parameter.

13

Douglas VRLA

Controlled Ferro

Special

Phase 1: Constant current at 16A/100Ah until 2.40v/c.

HF

Phase 2: Constant voltage at 2.40v/c until the current falls to 3A/100Ah or dvdt.

Phase 3: Constant current at 3A/100Ah until dvdt or 2.70v/c.

Phase 4: Constant voltage at 2.70v/c until dvdt.

14

n/a

Any

Factory Test

Phase 1: Full output for 1 minute.

Phase 2: Constant current at maximum regulation point for 1 minute.

Phase 3: Constant current at minimum regulation point for 1 minute.

Phase 4: Minimum output for 1 minute.

15

Flooded

Controlled Ferro

Opportunity Charge

Phase 1: Constant current at the start rate until 2.38 v/c.

Lead-Acid

HF

Phase 2: Off until the time of day reaches the set time.

Phase 3: Constant Voltage at 2.38 v/c until dvdt or the current falls to 5A/100Ah.

Phase 4: Constant Current at 5A/100Ah until dvdt.

*Additional Settings: start rate = SA parameter.

set time = ST parameter.

16 Flooded

Ferro-Resonant

Opportunity

Charge

Phase 1: Full output until 2.38 v/c.

Lead-Acid

Phase 2: Off until the time of day reaches the set time.

Phase 3: Full output until dvdt.

Phase 4: not used.

*Additional Settings: set time = ST parameter.

17

Exide Element

Controlled Ferro

Special

Phase 1: Constant current at 15.5A/100Ah until 2.37v/c.

HF

Phase 2: Constant voltage at 2.37v/c until the current falls to 2A/100Ah or dvdt or 3.5 hours.

Phase 3: Constant current at 2A/100Ah until dvdt or the remainder of the 3.5 hours from phase 2.

Phase 4: not used.

18 Lithium

Controlled

Ferro Special Phase

1: Constant current at the start rate until the float voltage is reached.

HF

Phase 2: Constant voltage at the float voltage until the current falls to 1.5A/100Ah or dvdt.

Phase 3: not used.

Phase 4: not used.

*Additional Settings: start rate = SA parameter.

float voltage = SV parameter.

* Refer to table 1 for information on how to program Additional Settings.

Table 2. Algorithm List Continued.