10
Any
Controlled Ferro
Shop Charger
Phase 1: Constant current at the start rate until the float voltage is reached or for the total run time.
HF
Phase 2: Constant voltage at the float voltage for the remainder of the total run time.
Phase 3: not used.
Phase 4: not used.
*Additional Settings: start rate = SA parameter.
float voltage = SV parameter.
total run time = ST parameter.
11
Geltec/Crown gel
Controlled Ferro
Special
Phase 1: Constant current at 16A/100Ah until 2.40v/c.
HF
Phase 2: Constant voltage at 2.40v/c until the current falls to 1.5A/100Ah or 6 hours.
Phase 3: Constant current at 1.5A/100Ah for the remainder of the 6 hours from phase 2.
Phase 4: not used.
12
Flooded
Controlled Ferro AGV Trickle Charge Phase 1: Constant current at the start rate until 2.40v/c.
Lead-Acid
HF
Phase 2: Constant voltage at 2.40v/c until the current falls to 1A/100Ah or dvdt.
Phase 3: Constant current at 4.5A/100Ah until 2.65v/c or 3 hours if manual equalize selected.
Phase 4: Constant voltage at 2.25v/c as long as the battery is connected.
*Additional Settings: start rate = SA parameter.
13
Douglas VRLA
Controlled Ferro
Special
Phase 1: Constant current at 16A/100Ah until 2.40v/c.
HF
Phase 2: Constant voltage at 2.40v/c until the current falls to 3A/100Ah or dvdt.
Phase 3: Constant current at 3A/100Ah until dvdt or 2.70v/c.
Phase 4: Constant voltage at 2.70v/c until dvdt.
14
n/a
Any
Factory Test
Phase 1: Full output for 1 minute.
Phase 2: Constant current at maximum regulation point for 1 minute.
Phase 3: Constant current at minimum regulation point for 1 minute.
Phase 4: Minimum output for 1 minute.
15
Flooded
Controlled Ferro
Opportunity Charge
Phase 1: Constant current at the start rate until 2.38 v/c.
Lead-Acid
HF
Phase 2: Off until the time of day reaches the set time.
Phase 3: Constant Voltage at 2.38 v/c until dvdt or the current falls to 5A/100Ah.
Phase 4: Constant Current at 5A/100Ah until dvdt.
*Additional Settings: start rate = SA parameter.
set time = ST parameter.
16 Flooded
Ferro-Resonant
Opportunity
Charge
Phase 1: Full output until 2.38 v/c.
Lead-Acid
Phase 2: Off until the time of day reaches the set time.
Phase 3: Full output until dvdt.
Phase 4: not used.
*Additional Settings: set time = ST parameter.
17
Exide Element
Controlled Ferro
Special
Phase 1: Constant current at 15.5A/100Ah until 2.37v/c.
HF
Phase 2: Constant voltage at 2.37v/c until the current falls to 2A/100Ah or dvdt or 3.5 hours.
Phase 3: Constant current at 2A/100Ah until dvdt or the remainder of the 3.5 hours from phase 2.
Phase 4: not used.
18 Lithium
Controlled
Ferro Special Phase
1: Constant current at the start rate until the float voltage is reached.
HF
Phase 2: Constant voltage at the float voltage until the current falls to 1.5A/100Ah or dvdt.
Phase 3: not used.
Phase 4: not used.
*Additional Settings: start rate = SA parameter.
float voltage = SV parameter.
* Refer to table 1 for information on how to program Additional Settings.
Table 2. Algorithm List Continued.