beautypg.com

20 complete the installation, 20 complete the installation -40 – Tweco 200 Ultra-Cut User Manual

Page 64

background image

Manual No. 0-5056 Ultra-Cut 200

3-40

INSTALLATION

3.20 Complete the Installation

1. Remove the cap from the coolant tank. Fill the coolant tank to the level shown, with Thermal Dynamics

coolant. The coolant level is visible through the translucent coolant tank. The amount of coolant required
varies with torch leads length.

Cat. Number and Mixture

Mixture

Protects To

7-3580 'Extra-Cool

TM

'

25 / 75

10° F / -12° C

7-3581 'Ultra-Cool

TM

'

50 / 50

27° F / -33° C

7-3582 'Extreme Cool

T M

'

Concentrate*

-65° F / -51° C

Coolant Capabilities

* For mixing with D-I Cool

TM

7-3583

RETURN

SUPPLY

RETURN

SUPPLY

Art # A-04803

COOLANT

Fill Range

Coolant Tank

2. After the complete system has been installed, check that the coolant has been pumped through the

system as follows (see NOTE):