4.01 Introduction
This section provides a description of the Power Supply
operating controls and procedures. Identification of the
Front and Rear Panel components is followed by operat-
ing procedures.
4.02 Functional Overview
The PAKMaster 50XL PLUS (CE) provides a degree of
operating flexibility and the use of simple controls.
4.03 Operating Controls
This subsection provides specfic functional descriptions
of the Power Supply operating controls and indicators.
A. Front and Side Panel
1. Control Panel
All operator controls, except gas pressure adjustment,
are located on this panel. Power ON/OFF and RUN/
SET/LATCH switches; CURRENT control; LED indi-
cators for AC Power, TEMP, GAS, and DC.
A-02458
1
2
3
4
5
Figure 4-1 Front and Side Panel Connections
2. Access Panel
A panel to gain access to the bulkhead area contain-
ing the torch connections.
3. Torch Leads Input
Hole in the front panel to feed the torch leads through
to the internal bulkhead connections. Factory installed
torch & leads.
4. Work Cable and Clamp
Work cable with clamp (factory installed).
5. Torch Leads and Spare Parts Kit Storage Area
Bracket connected to the side panel of the unit for use
in storing the torch, torch leads, work cable, and spare
parts kit when not in use. The Cutting Spare Parts
Kit fits into the opening on the top of the bracket. The
torch leads and work cable wrap around the bracket
for easy storage.
B. Control Panel
TEMP
AC
GAS
DC
LATCH
SET
RUN
ON
OFF
A
15
20
25
30
35
40
CURRENT
1
2
3
4 5
6 7
A-02455
Figure 4-2 Operating Controls
1. Current Control
Adjustment to set the desired output current between
15-40 amps.
2. ON/OFF Power Switch
ON position supplies AC power to activate all sys-
tem control circuits. OFF position deactivates control
circuits.
3. RUN/SET/LATCH Switch
RUN position is used for general torch operation
(torch switch must be held). SET position used for
setting gas pressure and purging lines. LATCH posi-
tion is used for specific applications (torch switch can
be released after main arc transfer).