beautypg.com

Cutmaster 25mm – Tweco 25mm Cutmaster User Manual

Page 60

background image

CUTMASTER 25MM

SERVICE

Manual 0-5080

5-8

Art # A-02476

Filter

Element

(Cat. No. 9-7741)

Housing

Cover

Barbed

Fitting

Spring

Assembled Filter

O-ring

(Cat. No. 9-7743)

Optional Single-Stage Filter Element Replacement

5. Remove the Filter Element from the Housing and

set Element aside to dry.

6. Wipe inside of housing clean, then insert the

replacement Filter Element open side first.

7. Replace Housing on Cover.

8. Reattach gas supply.

NOTE

If unit leaks between housing and cover,

inspect the O-Ring for cuts or other damage.

Optional Two-Stage Filter Element

Replacement

The Two-Stage Air Filter has two Filter Elements. When

the Filter Elements become dirty the Power Supply will

continue to operate but cut quality may become unac-

ceptable. Refer to Section 6, Parts List, for replacement

filter element catalog number.

1. Shut OFF primary input power.
2. Shut OFF air supply and bleed down system.

WARNING

Always turn OFF the air supply and bleed

the system before disassembling the Filter

Assembly as injury could result.

3. Loosen the two bolts on the top of the Filter As-

sembly enough to allow the Filter Elements to

move freely.

4. Note the location and orientation of the old Filter

Elements.

5. Slide out the old Filter Elements.

First & Second

Stage

Cartridges

(as marked)

Art # A-02942

Optional Two-Stage Filter Replacement

6. Slide the replacement Filter Elements into the

Filter Assembly, with the same orientation as

noted in Step 4 above.

7. Hand tighten the two bolts evenly, then torque

each bolt to 20 - 30 in-lbs (2.3 - 3.4 Nm). Improper

torque may damage the gasket.

8. Slowly apply air pressure to the assembly, check-

ing for leaks.

NOTE

A small amount of air leakage from the bot-

tom fitting is normal.

This completes the parts replacement procedures.