Final assembly – E-flite P-38/F-5E Lightning 400 ARF User Manual
Page 31
31
E-flite P-38/F-5E Lightning Assembly Manual
4. Use glue to install the drop tanks permanently, or use
double-sided tape so they can be removed in the future.
Final Assembly
Required Parts
• Assembled airframe
• Motor battery
1. Install the motor battery into the fuselage. Use the hook
and loop strap to keep it from falling out during flight.
Note: When using our recommended Brushed Motor
Power System, you MUST use a separate BEC or receiver
battery pack to power the radio gear if using more
than 3 servos.
Also, you must be sure to disable the BEC of the ESC by
removing the positive lead from the servo connector that
plugs into the throttle channel of the receiver. Failure to
do so when using a separate BEC or receiver battery
pack may result in ESC failure and a crash.