beautypg.com

Landing gear and drop tank installation (optional) – E-flite P-38/F-5E Lightning 400 ARF User Manual

Page 29

background image

E-flite P-38/F-5E Lightning Assembly Manual

9. Remove the backing from the pre-installed double-

sided tape on the center section cover. Position the servo

and motor/ESC leads in the channel in the wing and

attach the center section cover after removing the backing

from the factory-installed double-sided tape. You can also

use clear tape around the edges of the cover so it is more

secure during flight.

Note: If you need to remove the center section cover after

you have taped it down, use caution as it could pull up

your paint with it.

Landing Gear and Drop

Tank Installation (Optional)

Required Parts

• Assembled airframe

• Main gear (right and left)

• Nose gear

• 2mm x 10mm panhead screw (4)

• Steering arm

• Steering linkage

• Servo w/hardware

• Double-sided tape

Required Tools and Adhesives

• Phillips screwdriver

• Hex wrench: 1.5mm

Note: The installation of the landing gear and drop tanks

are optional. If you are flying from a rough surface or

in a situation that may not be conducive to having these

items installed you can select to skip this section.

1. Slide the main gear into the slots in the booms. Use

two 2mm x 10mm panhead screws to secure the gear.

This manual is related to the following products: