beautypg.com

E-flite P-38/F-5E Lightning 400 ARF User Manual

Page 24

background image

E-flite P-38/F-5E Lightning Assembly Manual

5. Install the speed control inside the fuselage. Solder

both sets of motor leads to the speed control, positive to

positive and negative to negative.

 6. Check the operation of the motors. The left-hand

gearbox shaft (when viewed from behind) should rotate

counterclockwise when viewed from the front. The right-

hand gearbox shaft (when viewed from behind) should

rotate clockwise when viewed from the front.

Note: If either motor is running in the opposite direction

that it should, simply reverse the two wire leads that

connect the ESC to the motor.

This manual is related to the following products: