Job specification sheet – Watts Fleck 2750 Brass Valve User Manual
Page 3

Page 3
Job Specification Sheet
Job.No..___________________
Model No. _________________
Water Test ________________
Capacity Per Unit ___________
Mineral Tank Size __________ Diameter __________ Height ___________
Brine Tank Size & Salt Setting per Regeneration ______________________
2750 Control Valve Specifications
1. Type of Timer
A. 7 Day or 12 Day
B. 310 to 5,270 Gallon Meter or
1,550 to 26,350 Gallon Meter or
Other
C. Meter Wiring Package
1. System #4 - 1 Tank, 1 Meter, Immediate or Delayed Regeneration, Time Clock
2. System #5 - Up to 5 Tanks, 1 Meter per Valve, Immediate Regeneration Only, All Tanks Online,.
Interlock System
3. System #6 - Up to 5 Tanks, 1 Meter, Delayed or Immediate Remote Meter, All Tanks Online, .
Series Regeneration System
4. System #7 - 2 Tanks, 1 Meter, Immediate or Delayed Remote Meter, 1 Tank Online, .
1 Tank Standby, Alternating System
2. Timer Program Settings
A. Backwash ________________________ Minutes
B. Brine & Slow Rinse __________________ Minutes
C. Rapid Rinse ________________________ Minutes
D. Brine Tank Refill _____________________ Minutes
3. Drain Line Flow Control __________________ GPM
4. Brine Line Flow Controller ________________ GPM
5. Injector Size # _________________________
6. Service Valve Operation Units (SVO)
Size of Service Valve ____________________