beautypg.com

Startup instructions, Final filter installation, Step 12 – Watts PWRO5MAN User Manual

Page 8

background image

8

Startup Instructions

Step A– Turn on the incoming cold water at the angle stop valve .

Turn the knob on the Adapt-A-Valve™ by turning coun-

terclockwise . Check the system for leaks, and tighten any

fittings as necessary . (Check frequently over the next 24

hours to ensure no leaks are present) .

Note: If you have connected your RO system to a refrigerator /

ice maker, make sure the ice maker is off (do not allow water to

flow to the ice maker) until flushing is complete and the tank has

been allowed to fill completely. Connection from the RO to the

ice maker system should have an inline valve installed before

the ice maker so it can easily be closed to prevent water flowing

to the ice maker during startup and periodic maintenance. Your

RO tank must be allowed to fill up fully in order for the ice maker

system to work properly.
Step B – Open the RO faucet and leave it open until water begins to

trickle out . (It will come out slowly) .

Step C – After water trickles out of the faucet, close the RO faucet

allowing the storage tank to fill with water . It may take 4 to

6 hours to fill the tank completely depending on the pro-

duction capability of the membrane, local water tempera-

ture and water pressure .

Note: During the fill period, you may hear water trickling due to

the Reverse Osmosis Process.
Step D – After the Tank has filled, open the RO Faucet to flush the

tank completely to remove carbon particles from final filter .

You will know that the tank is empty when the flow rate

from the RO faucet is down to a trickle . Repeat this step

two more times . The fourth tank can be used for drinking .

Note: Flushing of the tank three times is only necessary during

the initial startup and after replacing the membrane.
Important: Your reverse osmosis system contains replaceable

treatment components that are critical for effective containment

reduction. Periodic inspection and following proper system

maintenance is critical for continued performance.

Step A – Remove the caps from the final

filter .

Step B – Thread the

3

8

" grey plastic quick-

connect fittings into each end of

the Final Filter and tighten .

Step C – Cut the blue tubing between the

RO faucet and the RO module

at a desired locations to splice in

the in-line final filter .

Step D – With the directional flow arrow

on the final filter pointing towards

the faucet, insert the blue tubing

from the RO faucet into the fitting

on the final filter . Repeat this step

to connect the blue tubing from

the RO module into the inlet side

of the final filter .

Final Filter Installation

STEP 12