Metrohm 930 Compact IC Flex Oven/ChS/PP/Deg User Manual
Page 106
6.1
■■■■■■■■■■■■■■■■■■■■■■
98
■■■■■■■■
930 Compact IC Flex Oven/ChS/PP/Deg (2.930.2360)
Problem
Cause
Remedy
SPM – Reduced capacity.
Regenerate the SPM (see Chapter 5.12.3.2,
page 83).
Chromatograms
have poor resolution
Separation column –
Diminished separating effi-
ciency.
■
Regenerate the separation column (see
Chapter 5.16.4, page 93).
■
Replace the separation column (see "Con-
necting the separation column", page 53).
Extreme spread of
the peaks in the
chromatogram.
Splitting (dual
peaks)
Capillary connections –
dead volume in the system.
Check the capillary connections (see Chapter
3.2, page 14) (use PEEK capillaries with an
inner diameter of 0.25 mm between the injec-
tion valve and detector).
Guard column – Dimin-
ished efficiency.
■
Replace the guard column (see Chapter
3.19, page 49).
Separation column – Dead
volume at the column
head.
■
Install the separation column in the oppo-
site flow direction (if permitted by the leaf-
let) and rinse into a beaker.
■
Replace the separation column (see "Con-
necting the separation column", page 53).
Precision problems -
the measured values
are highly scattered.
Injection valve – Sample
loop.
Inspect the installation of the sample loop (see
"Optional: Exchanging the sample loop",
page 27).
Sample – There are gas
bubbles in the sample.
Use the sample degasser .
Sample – The rinsing vol-
ume is too small.
Increase the rinsing time (see Chapter 5.15,
page 91).
Injection valve – Defective.
Request Metrohm Service.
Vacuum is not being
built
Eluent degasser – Vacuum
connection on the rear of
the instrument is not
(tightly) sealed.
■
Seal the Vacuum connector tightly with a
threaded stopper (6.1446.040).