CommScope Drop Cable User Manual
Page 4
0.1 Table of Contents
Drop Cable Applications and Construction Manual
Section 8 ................Attaching to the NIU per NEC 830
8.1 Attaching to the NIU
8.2 Connecting to the Buried Drop
Section 9 ................Residential Interior Cabling
9.1 Overview
9.2 Planning and Pulling the Cable on the First Floor
9.3 Cutting Outlet Holes
9.4 Going Through an Exterior Wall
9.5 Walls from Below
9.6 Planning and Pulling the Cable on the Upper Floor
9.7 Fishing Cable into Place
9.8 Hiding the Cable
9.9 Coax Connectorization
9.10 QR
®
320 Connectorization
9.11 Connectorization UTP Cable
9.12 Trim-out and Finish
Section 10 ..............Multiple Dwelling Units (MDUs)
10.1 Overview
10.2 Planning and Pulling the Cable
10.3 One and Two Story Buildings
10.4 Taller Buildings Outside
10.5 Taller Buildings Outside
10.6 Inside the Residence
Section 11 ..............Commercial Installations
11.1 Overview
11.2 Wiring Schemes
Section 12 ..............Drop Cable Descriptions/Specifications
12.1 Specifications and Part Numbers
Section 13 ..............Appendix
13.1 Safety Overview
13.2 OSHA and NEC Standards
13.3 NEC and Other Ratings
13.4 NESC Standards and Construction Grades
13.5 Wire Clearance
13.6 Pole Lease Agreements and Other Codes
Section 14 ..............Broadband Resource Center