beautypg.com

Chapter 5 maintenance, Preparation for shipment, Elements – Bird Technologies 3128A User Manual

Page 27: Line section, Dc cables, Meter, Storage, Troubleshooting, Elements line section dc cables meter, Storage troubleshooting

background image

15

Chapter 5

Maintenance

Preparation for Shipment

Elements

The elements can be left in the sockets of the line section with their ARROWS turned midway between the measur-
ing positions. Any additional elements should be well padded and wrapped before being put in the shipping con-
tainer.

Line Section

Wrap the connectors on the flanged models with padding and tape them securely in place. Cover both ends of the
line section and the socket to keep out dust and foreign material. Place the line section in a sturdy shipping con-
tainer such as a corrugated paper box.

DC Cables

Pad and wrap the DC connector plugs and then coil the cables tightly.

Meter

Cover the meter face with padding to protect the glass window, then wrap the housing and place it in the same box
as the line section.

Storage

No special preparations for storage are necessary other than to cover the equipment to keep out dust and dirt. For
an extra precaution, leave an element in the socket with the arrow turned midway between the measuring posi-
tions.

Troubleshooting

The following table contains troubleshooting information for problems which can occur during normal operation.
Locate the problem, review the possible cause, and perform the corrective action listed.

Only those functions within the scope of normal maintenance are listed. This manual cannot list all malfunctions
that may occur, or all corrective actions. If a malfunction is not listed or not corrected by the listed corrective
actions, notify a qualified service center.

This manual is related to the following products: