Chapter 3 installation, Unpacking and inspection, Mounting – Bird Technologies 8930 Series User Manual
Page 15: Chapter 3, Installation
![background image](/manuals/583847/15/background.png)
5
Chapter 3
Installation
This chapter provides information for on-site requirements,
unpacking, inspection, and preparing the load for use.
Unpacking and
Inspection
1. Carefully inspect the shipping container for signs of damage. If
damage is noticed, do not unpack the unit. Immediately notify the
shipping carrier and Bird Electronic Corporation.
2. If the container is not damaged, unpack the unit. Save the packing
materials in case the unit should need to be shipped again.
3. Inspect all of the components for visible signs of damage.
Immediately notify the shipping carrier and Bird Electronic
Corporation of equipment damage or missing parts.
Mounting
Place the load in a dry, dust and vibration free environment. Do not
use outdoors or in areas of condensing humidity. Allow at least 15"
(40 cm) of clearance on all sides of the load, or mount it over a suitably
reinforced opening measuring 26"L x 7"W x 5"D (660 x 178 x 127 mm).
Bird 8930 Loads are intended for stationary or fixed use. The
mounting brackets on front and rear faces have four mounting holes
arranged in a 7" x 27
23
⁄
32
" (114.3 x 526.3 mm) rectangle. Use a screw
with a
3
⁄
8
" (9.5 mm) diameter max.
CAUTION
Do not block airflow. The air intake vent on the bottom of the load
must not be obstructed.
CAUTION
This load is designed for operation in a horizontal position only,
with the vent plug up. Do not use in any other manner.