Features, Easy installation, Clearance considerations – Rockwell Automation 2705-APG RediPanel Plug and Go Products User Manual
Page 5

Bulletin 2705
RediPANEL 800A Push Button Modules
User Manual
5
Easy Installation
Each RediPANEL is supplied complete with preassembled push buttons and
front plate. Separately ordered Bulletin 1492 wiring system cables plug
directly between the I/O Modules and the RediPANEL adapter boards,
eliminating hardwiring of individual devices. To install RediPANEL modules
follow these easy steps:
1. Cut an opening in the panel approximately 5.9 in. (149 mm) high x 8.6 in.
(218 mm) wide. See Figure 1.
2. Drill four 0.296” (7.52mm) dia. holes for the top and bottom mounting
brackets. A template is provided with the module to assist in this
operation.
3. Slide the module through the opening.
4. Apply the mounting brackets and tighten all the captive knurled
thumbscrews, being certain gasket is in place. Figure 1 shows screw
locations.
5. Connect the appropriate cables between the RediPANEL modules and the
PLC or SLC I/O modules. See page 10.
6. Connect external 24VDC power supply to pull-apart screw terminals on
the RediPANEL.
7. Connect green ground screw on the RediPANEL to the earth ground.
See pages 9 and 10 for detailed instructions on connecting power and
I/O cables.
Clearance Considerations
RediPANEL 800A Modules mounted inside an enclosure must have adequate
space for wire clearances. See Figure 2 for minimum recommended spacing.
Features